www.herald-journal.com
Enterprise Dispatch Legal Notices
New public notices published in the issue of Nov. 12, 2012
MINNESOTA SECRETARY OF STATE
CERTIFICATE OF ASSUMED NAME
Minnesota Statues Chapter 333
The filing of an assumed name does not provide a user with exclusive rights to that name. The filing is required for consumer protection in order to enable consumers to be able to identify the true owner of a business.
1. State the exact assumed name under which the business is or will be conducted: Waverly Lock Company
2. State the address of the principal place of business. 5816 1st. St. N., P.O. Box 263, Waverly, MN 55390
3. List the name and complete street address of all persons conducting business under the above Assumed Name or if an entity, provide the legal corporate, LLC, or Limited Partnership name and registered office address. Edward J. Scherman, 5816 1st St. N., Waverly, MN 55390
4. I certify that I am authorized to sign this certificate and I further certify that I understand that by signing this certificate, I am subject to the penalties of perjury as set forth in Minnesota Statutes section 609.48 as if I had signed this certificate under oath.
Date: 10-19-12
/s/ Edward J. Scherman
Owner
Phone: (763) 658-4650
Published in the Enterprise Dispatch Nov. 5 and 12, 2012.

OPEN HOUSE MEETING ON CSAH 5
Meeker County Highway Department will hold an informal open house to discuss improvements and obtain comments on the proposed improvements of County State Aid Highway 5, formerly 170th Street, from CSAH 15 to CSAH 18 in Collinwood Township.
The meeting will be held on Tuesday, December 11, 2012 from 4-7:00 p.m. in the Dassel City Hall at 460 3rd Street, Dassel. Interested parties living along or owning land adjacent to CSAH 5 in the above referenced area are encouraged to attend.
The scope of the proposed improvements to CSAH 5 include: rebuilding and resurfacing the road providing a future (2015) 12’ paved driving lane and a 4’ wide gravel shoulders, realignment at selected locations.
Additional right of way will be required along the entire length of the project. A tentative schedule for the start of right of way acquisition and project construction will be discussed.
Mark Spies
Assistant Highway Engineer
Published in the Enterprise Dispatch Nov. 12, 19, and 26, 2012.